September 2017

Energia recently signed a new contract with Mount Saint Mary’s College Contract Cost – $3.8 Million.
The guaranteed savings will be over $300,000 annually.

KEY MEASURES

  • LED upgrades on interior and exterior lighting
  • Boiler replacements at two locations
  • A/C unit replacements
  • Digital temperature control system upgrades
  • Pool air handler replacements
  • Pipe valve & fitting installation
  • Others