September 2017
Energia recently signed a new contract with Mount Saint Mary’s College Contract Cost – $3.8 Million.
The guaranteed savings will be over $300,000 annually.
KEY MEASURES
- LED upgrades on interior and exterior lighting
- Boiler replacements at two locations
- A/C unit replacements
- Digital temperature control system upgrades
- Pool air handler replacements
- Pipe valve & fitting installation
- Others